ZeroTime pulsed neutron

Flow behind pipe, updating fluid contacts, determining gravel pack condition, hydrocarbon saturation and mapping 3-phase hold up are essential to optimizing the long-term productivity and ultimate recovery from the reservoir. Pulsed neutron logging is an industry standard solution for providing this information, but until recently has been limited by legacy conveyance and logging programs.

Our proprietary system allows the state-of-the-art RAS pulsed neutron tool to be deployed on coiled tubing or drill pipe, while retaining the ability to circulate fully.

Complex well geometry, long horizontal sections, and locations without wireline capability. ZeroTime pulsed neutron increases the reach of the standard service and allows memory acquisition, simplifying conveyance requirements

Wells which were previously difficult and expensive to evaluate can now be logged safely and efficiently, while your reservoir keeps working.